1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk

Product Details
After-sales Service: 1year
Warranty: 1year
Condition: New

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2016-06-21
  • 1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
  • 1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
  • 1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
  • 1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
  • 1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
  • 1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
Find Similar Products

Basic Info.

Model NO.
JTRCG SERIES
Customized
Customized
Certification
ISO9001, QS
Tank Marerial
Non-Metal Tank
Storage Objects
Liquid
Effective Volume (L)
600-20000 or Customized
Design Pressure
ATM~1.0MPa
Design Temperature
0ºC~160ºC
Liner
SUS304, SUS316L
Insulation Layer
Rock Wool or Polyurethane (PU)
Landing Legs
SUS304
Treatment Types
Mechanical Polishing, Electropolishing, etc.
Inlet and Outlet
Quick Change Chuck, Flange
Motor Power(Kw)
1.1-11
Rotating Speed(R/Min)
60 (Adjusted)
Transport Package
Wooden Box or Customized
Trademark
Lanphan
Origin
China (Mainland)
Production Capacity
1000

Product Description

Product Description:
With reasonable design, advanced technology and automatic control, a liquid storage tank is produced in strict accordance with the requirements of GMP. It is designed, manufactured, examined and received according to GB/T150-2011 standard. The tank is made of high quality SUS304 or SUS316L.
1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
Application:
It is suitable for pure water storage, injection water storage, medicinal solution storage, intermediate buffer in the pharmaceutical industry, and also suitable for food, beverage industry, milk, fruit juice and other foods must be stored at room temperature and heated.
1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
Advantage:
The volume has a variety of specifications such as 600L~20000L, and can be designed and manufactured according to the actual requirements of customers.
The thermal insulation material of the thermal insulation layer is rock wool or polyurethane.
The inner surface adopts mirror polishing Ra≤0.28μm~0.28μm, and the outer surface can be polished, wire drawn, sandblasted, etc. according to customer requirements.1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
Precautions:
The use of stainless steel storage tanks is a very important exchange, which is directly related to the performance and quality of the product. Therefore, we need to strictly control when using stainless steel storage tanks.
1. This equipment is suitable for storage of liquid materials in sterile containers, so before production and use, cleaning should be used for cleaning. The cleaning should pay attention to various factors to solve the problem, and the pressure should be cleaned by the tank washer. Clean water is also re-washed through the dish washer, and each valve is closed after the cleaning liquid is placed at the bottom discharge port. Open the steam valve to sterilize and clear bacteria.
2. The steam pressure shall not exceed 147KPA
3. When disinfecting, pay attention to whether each pipeline valve leaks. If there is air leakage, deal with it in time to avoid bacterial intrusion in the air during storage.
4. After use, it should be cleaned in time.
5. The storage tank area should be kept clean and tidy. There should be no dry grass, no oil pollution and no combustibles in the fire dike; the drainage system should be equipped with water-sealed wells; the drainage pipe should be installed outside the fire dike with valves; when the oil tank is discharged, there should be special personnel to monitor and timely Remove residual oil in water-sealed wells; install non-explosion-proof electrical equipment and high-voltage overhead lines in the area; fire dikes should be set up in accordance with regulations, and fire dikes should be kept intact.
6. The top of the oil storage tank should be free of oil and water. The valves of the oil storage tank inlet and outlet pipelines should be insulated; the light-transmitting holes on the top of the oil storage tank, the cover of the inspection hole, the gasket should be kept intact, and the cover of the hole should be tightly closed. The oil measuring port should be implanted with non-sparking metal gaskets; the breathing valve on the tank and the hydraulic safety valve base should be equipped with a flame arrestor. The flame arrester is inspected at least once a season.
7. Lightning-proof and anti-static grounding device should be installed, and the grounding resistance should be greater than 10Q. There should be at least one grounding point every 30m along the bottom of the tank. Do not penetrate two grounding points for a single tank. Every spring, the lightning protection and anti-static grounding device should be inspected comprehensively, and the grounding resistance value should meet the requirements.
8. Wrap the cans with chemical fiber clothing and shoes with nails. Turn on and off the non-explosion-proof flashlight above the top of the tank. If the oil pipeline in the storage tank area catches fire, the cleaning operation shall comply with industry regulations. If the oil storage tank is on fire, report it immediately and stop the operation of the burning oil tank. Organize fire fighting and activate emergency plans in due course.1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk
Frequently Asked Questions (FAQ)
1. How long is the lead time for a single unit?
5-10 days under normal circumstances.
2. What are the specifications?
The volume has a variety of specifications such as 600L~20000L
3. Material.
The tank body replaces SS304 or SS316L material,
4. Is it possible to provide equipment with interlayer?
can. Insulation layer is made of rock wool or polyurethane
5. What is the applicable temperature?
The tank and jacket are according to customer requirements (0ºC~160ºC)
6. What is the design pressure?
ATM ~ 1.0Mpa1000 Litre CO2 IBC Stainless Steel Chemical and Containers Vertical Mixing Hot Liquid Storage Fgas Tank Tanks 1000 L for Milk

After-sales problem service process:
After the sales staff receives the customer's feedback, they will promptly respond to the customer's questions.
1.1 If the sales staff can deal with the problem in time, the customer will propose a solution within 24 hours;
1.2 If the customer's feedback needs to be transferred to the after-sales personnel for processing, the after-sales problem feedback information form will be sent to the after-sales personnel within 24 hours, and the after-sales personnel will formally intervene to deal with the customer's problems.
After the after-sales staff receives the information form, they will ask the salesman about the specific situation of the customer within 24 hours; at the same time, the sales staff is responsible for forming the whatsapp group of the customers, after-sales staff, and general manager.
After-sales personnel communicate directly with customers through email and whatsapp, learn more about the problems encountered by customers, and make appointments with customers for video call time within 3 working days.
The product equipment was inspected through the first video call and the equipment failure was initially confirmed, and effective solutions were proposed.
If the equipment can be repaired through the simple operation of the customer, the operation plan will be sent to the customer within 24 hours after the video. Wait for the customer to make preparations and make an appointment for the second video call to guide the on-site maintenance work.
4.11 If the equipment is repaired, the after-sales work is completed.
4.12 If the equipment is not repaired, a solution is proposed for the second time. Refer to 4.1 and 4.2 for the process. The equipment is repaired and the after-sales work is completed.
If the customer needs to ask a technician for on-site repairs in the local area, the preparatory work and repair procedures before the on-site repair will be sent to the customer within 24 hours after the video. And at the time of the technician's door-to-door visit, we will also conduct a video call with the customer to guide the on-site maintenance work.
4.21 If the equipment is repaired, the after-sales work is completed.
4.22 If the equipment is not repaired, a solution is proposed for the second time. Refer to 4.1 or 4.2 for the process. The equipment is repaired and the after-sales work is completed.
If the customer needs to replace the parts, the after-sales staff will notify the sales staff to reissue the parts through the Fortis customer management module or Dingding within 12 hours after the video. The salesperson fills in the after-sales problem order form within 24 hours after receiving the information, and informs the customer of the delivery progress at the same time. After the customer receives the accessories, refer to 4.1 or 4.2
4.31 If the equipment is repaired, the after-sales work is completed.
4.32 If the equipment is not repaired, refer to 4.12 or 4.22.
5. After the after-sales service is over, the sales staff sends the after-sales service evaluation form to the customer and invites the customer to evaluate the after-sales work.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier